Welcome to the official website of Nanyang Xinte Electrical Co., Ltd.
2023-06-06
The company speeded up development, comprehensively initiated construction of the 40 mu branch plant, continued to strengthen integration of brand strategies, talent elements, technological innovation and marketing channels, maintained sustainable development of core business and improved competitive advantages.
2023-06-06
An Iraqi customer came to the factory for inspection of goods on May 5, 2023
An Iraqi customer came to the factory for inspection of goods on May 5, 2023 ...
2023-06-01
After nearly 4 years of development, the company had begun to take shape, become a qualified supplier of State Grid and established a series of scientific and standardized management systems. The company passed ISO9001 international quality management system certification and CCC certification.
2023-05-29
What are the conditions for immediate power outage of running dry-type transformers
1. The dry-type transformer must be shut down when it is on fire.2. The dry-type transformer must be shut down for inspection by professionals when it is found that severe breakage or discharging occurs to the bushing of the dry-type transformer.3. The dry-type transformer must be shut down when its oil conservator and air duct eject oil and smoke.
2023-05-29
How can faults of the dry-type transformer be diagnosed based on abnormal sounds
There is no noise when the dry-type transformer is running, which is normal. Sometimes there are some noise, which indicates that it can be judged via the sound whether the transformer is faulty. Actually, it can be judged via the sound of the dry-type transformer whether any damage occurs to it. Generally speaking, if there are several problems with the sound of the dry-type transformer, it indicates that it has broken down and must be repaired. When there are such problems with the sound of the working dry-type transformer, it usually indicates that your dry-type transformer has broken down. Here are some details below:
2023-05-29
A domestic large-capacity transformer has passed the sudden short circuit test
Introduction: The DFP-240000/400TH power transformer independently developed by Shandong Power Equipment Co., Ltd. has successfully passed in the Netherlands the sudden short circuit test of KEMA Company, an international authoritative quality certification agency. This is the first Chinese large-capacity transformer that has passed this test. The short circuit withstanding capacity test is a special test for transformers.
2023-05-29
There is an urgent need for transformers in smart grid construction
News from www.chinasmartgrid.com.cn: Smart grid construction is implemented during the 12thFive-year Plan period. In the next few years, the State Grid Corporation of China will start to build an ultra-high voltage backbone grid of a “three-vertical and three-horizontal structure” connecting China’s large energy bases and major power load centers, which requires a lot of intelligent high-voltage equipment such as transformers, reactors, circuit breakers, GIS, power cables
2023-05-29
Installation and maintenance of box-type substations
The installation, acceptance, handover test, commissioning, operation and maintenance of box-type substations should abide by regulations of the power authority, and the following issues should be noted: After receiving the commodity, the user should carefully check the commodity and should store the commodity in a proper place according to the normal use condition, if the product is not used temporarily.
2023-05-29
Kenyan customers visited Xinte Company on February 4, 2018
Kenyan customers visited Xinte Company on February 4, 2018
2023-05-29
Indian customers investigated Xinte Company’s products on September 2, 2016
Indian customers investigated Xinte Company’s products on September 2, 2016
Message